IEEFA supports new bill prohibiting the opening up of thermal coal mining in Queensland’s Galilee Basin
Diversifying its gas-focused portfolio Down Under, the Italian oil group has acquired the Northern Territory’s largest solar project – the 33.7 MWp Katherine Solar Farm.
The first sod has been turned on a $30 million smart microgrid which is to power Deakin University’s Waurn Ponds Campus. The project, featuring a 7 MW solar farm and a 1 MW battery, is delivered in partnership with AusNet Services and its subsidiary Mondo with the goal to provide an integrated research and education platform, and contribute to the university’s sustainability goals.
With li-ion battery supply chains stretched by the rapid EV and energy storage uptake, Western Australia is looking to position itself at the forefront of global battery manufacturing. The state government has launched a strategy to grow WA’s future battery industry, which includes plans for an investment attraction strategy.
After it launched construction on its first solar project in Australia last month, Indonesia’s Terregra Renewables is all set to break ground on another 5 MW solar farm in South Australia.
A flagship report from the Senate Committee on Electric Vehicles (EV) has called on the federal government to adopt a strategy that will accelerate EV uptake in Australia, and implement new vehicle emissions standards to encourage manufacturers to sell more EVs. Since a growing EV fleet could pose a challenge to the grid, solar is set to assume an important role in flattening out the demand and supply curve.
The Robertstown region could host two massive renewable energy projects – a proposed 500 MW solar farm collocated with 250 MW/1000 MWh of battery storage, and a construction-ready 200 MW solar PV farm and 120 MWh energy storage component that form part of the Solar River Project, the size of which could double at a later stage.
A major project featuring 120 MW wind and 50 MW solar PV in Western Australia has secured all state and federal approvals and is scheduled to start construction later this year. An energy storage facility is to be included at a later stage.
Commercial electricity retailer Flow Power has signed an offtake deal with Germany’s BayWa r.e. for 48 MW of clean electricity generated at two of northern Victoria’s largest solar farms – the 112 MW Karadoc Solar Farm and 106 MW Yatpool Solar Farm.
Queensland is in line for its first community-scale battery to be installed on Townsville’s outskirts because of the high number of rooftop solar systems and close proximity to electricity infrastructure. The energy storage system should be operating by the end of the year.
This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.