As part of an open storage system, its grid management capabilities support public utilities, distribution system operators, EPCs and large businesses in balancing generation and load of power networks.
Many battery inverters + one battery = reliable and efficient energy storage
The battery inverters can be operated in parallel on the DC side. This allows for multiple inverters to be connected to a single battery with a large capacity. The advantages are highest system availability and efficiency of the energy storage system.
Ready for all kinds of energy storage and grid management applications
The blueplanet gridsave 50.0 TL3-S is deployed between battery storage and power grid and can be connected in parallel on the AC side without a limitation in number. The power grid can be the national grid, a power supply of a small town or industrial facility: The size of the storage system is scalable according to requirements for decentralized applications up into the megawatt range.
By supplying stored energy in times of high energy demand, the battery inverter regulates energy peaks. Charging and discharging batteries, it also provides grid support by compensating reactive power or supplying additional active power.
Open communication standard
The blueplanet gridsave 50.0 TL3-S is controlled by an external Energy Management System (EMS). For that purpose, the inverter communicates via open Sunspec Modbus TCP for use with different EMS’s. This widespread interface allows for a large number of available controllers to manage the energy storage system. The blueplanet gridsave 50.0 TL3-S can therefore easily meet individual requirements in the design of the storage application.
The blueplanet gridsave 50.0 TL3-S is approved according to BDEW and ISO.
By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.
Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.
You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.
Further information on data privacy can be found in our Data Protection Policy.