Schneider Electric launches new storage systems for microgrids

Share

From pv magazine Global

France-headquartered Schneider Electric has announced a new battery energy storage system (BESS) for microgrids. It is available in two enclosure sizes and has different storage and discharge configurations.

“Comprised of a battery system, battery management system, power conversion system, and controller, BESS has been tested and validated to work as an integral component of Schneider Electric’s standardized microgrid system, EcoStruxure Microgrid Flex,” the company said in a statement. “It is fully integrated into the software suite, which includes EcoStruxure Microgrid Operation and EcoStruxure Microgrid Advisor.”

The BESS 2.1 m (7ft) long enclosure has a power capacity of 60 kW or 90 kW and maximum storage of 246 kWh, with a discharge configuration of two or four hours. It weighs 3.6 metric tons, and it is AC and DC coupled. The 6.06 m (20ft) enclosure has a power capacity of 250 kW, 375 kW, or 500 kW, and maximum storage of 1,720 kWh, with a discharge configuration of two or four hours. It weighs 25 metric tons, and it is AC coupled only.

“The BESS is a fully self-contained solution built upon a flexible, scalable, and highly efficient architecture delivering flexibility, helping to minimize energy costs and maximize renewable energy,” the company said. “As part of a microgrid system, the BESS leverages onsite generation sources to optimise the entire system, delivering energy and cost savings while maximizing usage of renewables.”

Both enclosures use lithium-ion iron phosphate (LFP) batteries, which have a rated calendar life of 15-20 years and more than 6,000 cycles. The operating temperature of the battery energy storage systems ranges from -20 C to 50 C, and Schneider Electric offers a three-year warranty.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Northern Territory lands $250 million for new transmission projects and upgrades
25 July 2024 The Northern Territory and Australian government have signed a landmark $250 million deal under the Rewiring the Nation fund to upgrade the Territory’...