Skip to content

Oceania

Not so fast… the Bouldercombe Battery is not yet back into service after the fire

On September 26, the Bouldercombe battery in Queensland caught fire during its commissioning process. Now, it is being reported the battery facility is already back up and running – which isn’t quite the case, WattClarity’s Paul McArdle explains.

High Court rules Victoria’s EV tax is ‘invalid’

Victoria’s High Court has deemed the Victorian government’s tax on electric vehicles “invalid”, saying Australia’s Constitution enshrines that only the Commonwealth government has the power to enforce such taxes.

RMIT software tool unlocks BIPV design

RMIT University in Australia has developed new software that integrates product, regulation, technical, economic, and construction data. It helps architects and engineers to estimate the cost of building-integrated photovoltaics (BIPV) during the conceptual design phase.

Adelaide cuts emissions at train stations, starts testing hydrogen buses

Diesel trains have been retrofitted with batteries and are now running from Adelaide stations, in the latest of a spate of sustainable transport trials in the South Australian capital. This includes trials with fully electric trains and the beginning of trials with hydrogen-powered and pure electric buses.

Regulator dismisses community dispute of VNI-West interconnector

The Australian Energy Regulator has rejected a community group’s challenge to the Victoria to New South Wales Interconnector West, or VNI West, transmission project.

2

Massive lithium takeover deal collapses following Rinehart intervention

US giant Albemarle Corp. has withdrawn its $6.6 billion takeover bid for Australian lithium developer Liontown Resources after Gina Rinehart, via her company Hancock Prospecting, reportedly spent $1.3 billion raising its stake in Liontown to a commanding 19.9%.

The human factor: why Australia’s net zero transition risks failing unless it is fair

This article is part of a series by The Conversation, Getting to Zero, examining Australia’s energy transition.

Monash researchers achieve lithium-sulphur battery breakthrough

Researchers at Victoria’s Monash University have developed a new lithium-sulphur battery design they claim requires less lithium, has more energy per unit volume, lasts longer and can be produced for half the price of the dominant lithium-ion technology.

CEFC rolls out first investment under $20 billion Rewiring the Nation fund

The Clean Energy Finance Corporation has made its first investment via the Australian government’s $20 billion (USD 12.67 billion) Rewiring the Nation Fund, committing $100 million to support the build-out of renewable generation, long-duration storage and grid infrastructure in New South Wales.

Boundary reveals ‘Australian first’ hydrogen-powered stand-alone power system

Boundary Power is claiming an Australian first with the unveiling of a 100% relocatable and modular stand-alone power system that integrates solar with a hydrogen electrolyser and storage system, doing away with the traditional back-up diesel generator.

This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close