The building-sized trucks run on diesel and prompt logistical complications as large amounts of diesel must be shipped to remote mining sites. Attempts to decarbonize the mining sector will have to consider the heavy-duty vehicles.
The first rows of solar panels have been laid on the roof of the Main Assembly Building at Tonsley Innovation District. The 2.34 MW solar array will ultimately work in conjunction with on-site battery storage and smart technologies as part of South Australia’s first district energy scheme.
The Australian Energy Market Commission (AEMC) has released a discussion paper toward a blueprint for the coordination of generation and transmission investment. The draft proposal seeks to overhaul wholesale pricing and transmission access toward lowering electricity costs and the ever-increasing risks inherent in getting new renewable energy generation into the network.
Solar infrastructure developer Lyon Group has strengthened its ties in the Asian markets through a significant joint-venture with two of Asia’s largest energy generators. The agreement will see integrated battery storage systems utilised to reduce the risk of curtailment and increase the flexibility of renewable energy plants.
ARENA’s round of funding for renewable-energy forecasting technologies, initiated in early 2018, is coming to fruition, with wide-ranging benefits for solar farm earnings and the stability of a low- to no-carbon NEM.
Renewables developer Infigen has announced that the 25MW/52MWh Tesla battery at the Lake Bonney wind farm has been energised and registered with AEMO. The battery is expected to be fully commissioned by the year’s end.
The new solar-powered EV charging stations with integrated energy storage are designed to support electric vehicles even in the height of summer. The technology is developed by Australia’s national science agency in collaboration with Nissan Australia and Delta Electronics and backed by funding from the Victorian Government.
Pumped hydro and battery-storage projects took the lion’s share of feasibility-study grants today awarded under the NSW Emerging Energy Program. Alongside VPP proposals, they feature also in the shortlist of 21 projects now in the running for capital funding.
The showpiece 3.6 GW Fengning county project which will offer grid services and back-up power at the 2022 Winter Olympics is part of a 31.15 GW construction pipeline of projects, many of which are set to come into service next year.
Australia’s chief scientist Dr Alan Finkel continues to voice his support for some modicum of Carbon Capture and Storage (CCS) in Australia’s hydrogen future, providing a lifeline to fossil fuel producers. While Finkel’s argument holds some water, it holds nowhere near enough water to produce a hydrogen economy.
This website uses cookies to anonymously count visitor numbers. To find out more, please see our Data Protection Policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.